One stage of your project

Bespoke furniture fitting and installation in Marbella

We can assist you inEspañolEnglishDeutschРусский

The last stage begins before the van arrives. We check whether the pieces will fit through the entrance, whether the room is ready and where the furniture can be fixed. At installation, each door and drawer is adjusted in its final position.

Project process

A fitting date depends on a ready room

Before the date is fixed, we check that flooring, wall finishes and service points match the approved drawing. We also ask whether a lift needs booking or whether the building limits unloading hours. A moved socket or unfinished plaster can affect the order in which sections are fitted.

01

Arrival route

We confirm unloading, lift or stairs and the space available to carry each section.

02

Walls and supports

Fixings follow the actual construction and expected load.

03

Movement set on site

Hinges, runners and sliding doors are adjusted after cabinets are levelled.

04

Walk-through at handover

We open each moving part with you and record anything needing attention.

Project thinking

What the team checks on installation day

A prepared site makes the final adjustments possible without guessing.

01

Clear working area

There should be room to set down protected panels and assemble them without other trades working in the same corner. Wet paint, fresh flooring and loose materials can delay fitting or damage a finished surface.

02

Shared parts of the building

We agree where the vehicle can stop, whether a lift can be reserved and how corridors will be protected. For larger panels, stair turns and door widths matter more than the straight-line distance from the street.

03

After fitting

Each moving part is operated after adjustment. We show how the mechanisms work, note the care needed for the selected finish and record any item that needs a return visit rather than leaving it ambiguous.

Before choosing

Questions about furniture delivery and fitting

Does the price include installation?+

The approved quote identifies delivery and fitting where included, and lists work by other trades separately.

Can you fit while a refurbishment is underway?+

Only when the room is at the agreed stage and remaining work will not damage or move the cabinetry.

What do you test at handover?+

We test every door, drawer and sliding run, then look at visible joins and surfaces in the room lighting. The client can raise anything that needs attention during this walk-through.

Your project starts here

Show us the delivery route

Along with room photographs, send the floor number and images of any narrow entrance, lift or staircase.

  1. 01 Initial reply and feasibility review
  2. 02 Suggested next step
  3. 03 A detailed quotation antes de fabricar
Ask on WhatsApp

No obligation · A detailed quotation antes de fabricar