Kitchen manufacturing from drawings in Marbella

We can assist you inEspañolEnglishDeutschРусский

If your practice has already designed the kitchen, we can assess its manufacture. We read drawings as working documents: which dimensions are final, which appliances are selected and which junctions still depend on site work.

A specification the team can identify

The design may be well advanced, but approved decisions and open choices must be clearly marked.

01

Interior design practices

We review fronts, handles, appliances and junctions with the wider interior. The visual proposal becomes pieces that can be made and fitted.

02

Architects and site managers

Dimensions, services and trade sequence tell us when final measurement can be trusted.

03

Builders and refurbishers

We distinguish delivery and fitting from building, electrical, plumbing and worktop tasks, and identify who arranges site access.

Still looking for a design for your own kitchen? Explore bespoke kitchens for homes

Drawings that allow a kitchen to be priced

There is no need to hide missing decisions. Date each drawing and show which dimensions will be checked when building work finishes.

01

Plans and elevations

Widths, heights, depths, openings and obstructions are needed. A render helps appearance, but cannot set cutting dimensions.

02

Cabinets and openings

List drawers, doors, towers and special pieces. Show swing directions and fronts near circulation routes.

03

Finishes selected

Specify board, veneer, lacquer, edges and handles, or flag alternatives to price. Samples are approved before ordering.

04

Appliance sheets

Oven, fridge, dishwasher and extraction set voids, ventilation, access and services. Send exact models when known.

05

Site dimensions

Say who measured and whether floors, walls and ceiling are finished. Critical sizes are verified before production.

06

Units and delivery

Separate each layout and quantity. Across multiple homes, confirm which cabinets truly repeat and which need adjustment.

The boundary of the commission

Our proposal is tied to a particular drawing revision. Each item should be traceable to its specification and responsible party.

01

Components supplied

Carcasses, fronts, interiors, fittings, fillers and finishing pieces are itemised. Reference substitutions require approval.

02

Site work and fitting

Measurement, transport, unloading and installation are stated where included. Worktops, connections and other trades are identified separately.

03

Later revisions

A changed drawing after sign-off can affect cost and date. The change is recorded before the production order moves.

From drawing file to fitted kitchen

Profile image for Alba Cano
Your local project managerAlba CanoProject guidance and follow-up

Are the drawings ready to price?

Send what has been drawn and mark remaining choices. We will say whether cabinetry can be priced or what should be resolved first.

Questions from design and building teams

Can you make a design by another practice?

We can assess it if dimensions, materials and responsibilities are clear. Buildability is reviewed before the commission is accepted.

What if there is no cabinet schedule yet?

We can review the project stage. Before pricing, the team agrees who develops and signs off the detail.

Who is responsible for dimensions?

Measurement and approval roles are recorded. If walls, flooring or appliances change, affected sizes are checked again.

Can you suggest other fittings?

Yes, as a clearly identified alternative. An approved reference is not changed without checking function, appearance, cost and availability.

Are worktops and appliances included?

Only if the proposal says so. We can coordinate dimensional compatibility with their suppliers.

When is the delivery date confirmed?

After dimensions, specification, scope and access conditions are approved. An initial target date does not book workshop time.

What files can I send?

Legible PDF drawings, images and technical sheets. The form accepts attachments; CAD users can export relevant sheets to PDF.

Share your project drawings

Give practice name, role, municipality, kitchen count and site stage. Attach the drawing revision for review.

  1. 01Dated, dimensioned plans
  2. 02Appliances and chosen finishes
  3. 03Manufacturing and fitting scope

Initial review identifies the next step; price and programme follow approved scope.